Cables Cows and Enexis Tender

Prysmian Netherlands Secures Key Role in €2.3 Billion Enexis Netbeheer Power Grid Expansion

Supporting the Netherlands' Energy Transition Through Vital Cable Infrastructure

21/10/2024 - 01:16 PM

Delft, 25th September 2024 – Prysmian Netherlands is proud to announce that it has been awarded a significant portion of the tender as part of Enexis Netbeheer's ambitious €2.3 billion investment to expand and reinforce the electricity grid across the Dutch provinces of Groningen, Drenthe, Overijssel, Brabant, and Limburg. This project, initially planned for 8 years but with the possibility of extension up to 12 years, is crucial for meeting the demands of the Netherlands' rapidly evolving energy landscape and marks a major step forward in the nation’s energy transition.

The project will see the installation of over 76,000 kilometres of new power cables, with approximately 40,000 kilometres dedicated to medium-voltage cables and more than 36,000 kilometres for low-voltage cables. These new installations are necessary to support the growing capacity of renewable energy sources, such as solar and wind, as well as the increasing electrification of homes, businesses, and industries.  

A Strong Partnership for the Future

Prysmian Netherlands is honoured to extend its longstanding partnership with Enexis Netbeheer, a collaboration that embodies a shared vision for powering the future of the Netherlands. Through this alliance, Prysmian will provide a substantial supply of medium and low voltage cables, while also embracing a commitment to sustainability. The company is focused on incorporating more sustainable materials into its products, increasing the use of recycled content, and minimizing CO2 emissions during production and transport.

This partnership plays a crucial role in enhancing the reliability and resilience of the electricity network, facilitating essential upgrades needed for the nation’s energy transition.

Sander Lauwers, Commercial Director Transmission & Power Grid at Prysmian Netherlands, emphasized the importance of this result: “Being a part of Enexis Netbeheer’s power grid expansion is not just a business opportunity; it’s a responsibility we take seriously. Our cables will be the arteries of the future energy system, ensuring that the increasing volumes of renewable energy can be efficiently distributed across the country. This project underscores our commitment to supporting the energy transition and securing a sustainable future. Moreover we are proud to emphasize that these cables, for the Dutch Grid, are manufactured in our plants in Delft and Emmen”

Driving the Energy Transition

Prysmian Netherlands plays a crucial role in the Netherlands' energy transition, providing the essential infrastructure that enables the integration of renewable energy sources into the national grid. Our advanced cable solutions are designed to meet the challenges of a modern, sustainable energy system, and this result is a testament to our leadership in the industry.

Through our trusted collaboration with Enexis Netbeheer, we are not only helping to build a more robust and reliable electricity network but also contributing to the broader goal of achieving a carbon-neutral energy system in the Netherlands.